Choose the test before looking at the result. Record every test, including those that found nothing. Give the size of the difference, not just the p-value.
| Practical question | Hypotheses | Data | Test and why | Checks | Result | Decision |
|---|---|---|---|---|---|---|
| Is the mean wait above 7 days? | H0: mean = 7 · H1: mean > 7 | 60 waits | One-sample t (n = 60, averages near normal) | Skew noted; Wilcoxon run as a check | t = 4.11, p = 0.00006 | Gap to target is real |
| Did waits change at week 12? | H0: no difference | 20 weekly medians | Two-sample t; Mann-Whitney | F-test p = 0.10 (similar spreads) | +3.3 days; p below 0.0001 | Root cause: lost sessions |
| Do waits differ by weekday? | H0: all days equal | 60 waits by day | ANOVA; Kruskal-Wallis; Mood's median | Levene p = 0.07; data skewed | F = 7.39; H = 19.66; all p below 0.001 | Root cause: Monday demand |
| Is Monday worst every week? | H0: no day effect within weeks | 9 weeks × 5 days | Friedman (blocks = weeks) | Every cell filled | 22.85, p = 0.0001 | Consistent effect |
| Do reminders matter? | H0: same missed share | 1,400 appointments | Two-proportion test | Expected counts large | 8.1% against 19.0%, z = 5.13 | Likely cause; pilot to confirm |
| Missed by days booked ahead? | H0: independent | 4 × 2 table | Chi-square | All expected counts above 5 | 74.6, p below 0.0001 | Vicious circle confirmed |
Letters and symbols: ANOVA Analysis of variance: a test that compares the averages of three or more groups · H0 · H1 The null hypothesis (no difference, or normal data) and the alternative hypothesis · ÷ × Divided by, multiplied by