Bookkeeping app 41 questions 5 phases
Tallybook: a Scrum Master case study Tallybook makes a bookkeeping app for small businesses. The team has worked for years with an engineering manager who hands out tasks every morning. Now the company wants Scrum, and you've just been hired as their first Scrum Master. Nobody is quite sure what that means, including the manager.
What this case study tests
A manager who assigns tasks Daily Scrum as a status report Removing impediments Coaching self-management
You're the Scrum Master. For each situation, choose your answer and press Check . Every option is then explained, right or wrong.
Team
Abbas (Product Owner) New to the role, used to being a business analyst Alba (Developer) Backend, banking integrations Ansel (Developer) App screens Ari (Developer) Testing, quiet in meetings Stakeholders
Augustin (Engineering Manager) Line manager of the Developers Aurelia (Head of Product) Sponsor and budget Amos (Support Lead) Hears every customer complaint Adele (Customer) Runs a small café, hates paperwork Tallybook
Getting started Your first week at Tallybook
Question 1 of 41 Choose 1
Aurelia (Head of Product) Welcome, Ada! We want Scrum by next month. Where will you start?
What is the best first step? Publish a Scrum rulebook for the company and require everyone to follow it from Monday Incorrect. Rules without understanding rarely stick. People need to know why each part exists.Get to know the team, the Product Owner and the managers, and how work flows today Correct. Right. You can only help people use Scrum well once you understand where they are now.Replace the morning task meeting with a Daily Scrum, starting from tomorrow Incorrect. Changing the ritual before people understand it usually just renames the old meeting.
Learn it on Day 1: A new team
Check answer
Question 2 of 41 Choose 1
Augustin (Engineering Manager) So you'll run the team now? Good. I'll send you the task list each morning and you hand it out.
How do you describe your accountability to Augustin (Engineering Manager)? “I help the team use Scrum well and become self-managing.” Correct. Right. The Scrum Master serves the team; the Developers decide how to do their work.“Yes: I'll be the new task manager for the team.” Incorrect. Assigning tasks takes away the team's self-management.“I mainly book the meetings and keep the board up to date.” Incorrect. Scheduling isn't the accountability. The team's effectiveness is.
Learn it on Day 1: A new team
Check answer
Question 3 of 41 True or false
Aurelia (Head of Product) We'll keep the morning task meeting and the monthly status report, and add the Sprint Review. That's Scrum, right?
True or false: using only some parts of Scrum is still Scrum. True Incorrect. The Scrum Guide says Scrum is immutable: using only parts of it may be useful, but the result is not Scrum.False Correct. Correct. Each element serves a purpose. Implementing only parts is possible, but it isn't Scrum.
Learn it on Day 1: A new team
Check answer
Question 4 of 41 Choose 1
Abbas (Product Owner) I'm the Product Owner now. Can you write the Product Goal for me? You know Scrum better.
What do you do? Write the goal for him, since he's new to the Product Owner role Incorrect. The Product Goal is the Product Owner's accountability. Writing it for him takes that away.Tell him a Product Goal isn't needed in the first few months of Scrum Incorrect. The Product Goal gives the Scrum Team a long-term objective to plan against.Offer techniques and facilitate, while Abbas owns the goal Correct. Right. The Scrum Master helps the Product Owner find techniques for effective Product Goal definition.
Learn it on Day 3: Coach the vision
Check answer
Question 5 of 41 Choose 2
Ansel (Developer) Who's actually in the Scrum Team? Is Augustin (Engineering Manager) in it?
Which two statements are true? It's one Scrum Master, one Product Owner and the Developers Correct. Correct.A manager leads the Scrum Team and approves its decisions Incorrect. There is no hierarchy within a Scrum Team.The Scrum Team is cross-functional and self-managing Correct. Correct. It has the skills it needs and decides who does what, when and how.Every Scrum Team has a separate testing sub-team Incorrect. Scrum Teams have no sub-teams.
Learn it on Day 1: A new team
Check answer
Question 6 of 41 Choose 1
Amos (Support Lead) I want my support tickets fixed. Can I just give them to Alba (Developer) directly?
What do you tell Amos (Support Lead)? “Yes: the more direct the contact, the faster things move.” Incorrect. Then work arrives from many sides and nobody knows what matters most.“Stakeholders may never talk to the Developers directly.” Incorrect. Scrum doesn't forbid conversations. Collaboration is encouraged.“Talk to the team any time, but work goes through Abbas.” Correct. Right. Stakeholders are welcome; the Product Owner orders the work.
Learn it on Day 2: Who talks to whom
Check answer
Question 7 of 41 Choose 1
Alba (Developer) The backlog is in Abbas's spreadsheet on his laptop. We never see it.
What do you help with? Help Abbas make one Product Backlog visible to everyone Correct. Right. The Product Backlog must be transparent, visible and understood.Start a separate backlog for the Developers' own tasks Incorrect. One product has one Product Backlog.Leave it: the Product Owner can keep the backlog private Incorrect. A hidden backlog makes inspection and adaptation impossible.
Learn it on Day 4: Transparency first
Check answer
Question 8 of 41 Choose 1
Ari (Developer) Augustin (Engineering Manager) says the Sprints should be two weeks because that's the company standard.
Which statement is true? Sprints must always be exactly two weeks long, in every team Incorrect. Two weeks is popular, not a rule.Sprints are fixed-length events of one month or less Correct. Correct. Within that limit, the Scrum Team commonly agrees the length together (Common practice).Sprint length is decided by the engineering manager Incorrect. The Guide sets only the maximum. The length serves the team's learning, not a manager's preference.
Learn it on Day 5: Team agreements
Check answer
Tallybook
Sprint 1 Goal: small businesses can import their bank transactions
Question 9 of 41 Choose 1
Augustin (Engineering Manager) I'll sit in Sprint Planning and tell them how much they can take. They always underestimate themselves.
Who selects how much work goes into the Sprint? The Developers, from their capacity and recent Sprints Correct. Right. A forecast the Developers believe in is the one they can commit to.Augustin (Engineering Manager), who knows the team best Incorrect. That removes the team's ownership of its forecast.Abbas (Product Owner), who is accountable for value Incorrect. The Product Owner explains value; the Developers decide how much fits.
Learn it on Day 6: Sprint 1 Planning
Check answer
Question 10 of 41 Choose 1
Ada (Scrum Master) Sprint Planning is at hour three and they're still debating the database.
What should you do? Let it run on until everyone agrees on the database choice Incorrect. Events are timeboxed. The plan needs enough detail to start; the rest emerges.Decide the database yourself, to end the debate and get them started Incorrect. How to build it is the Developers' call.Name the timebox and help them agree a goal and enough to start Correct. Right. The Scrum Master ensures events are positive, productive and kept within the timebox.
Learn it on Day 6: Sprint 1 Planning
Check answer
Question 11 of 41 True or false
Abbas (Product Owner) Do we need a Sprint Goal if we already have the list of items?
True or false: every Sprint has a Sprint Goal created by the whole Scrum Team. True Correct. Correct. The Sprint Goal is the commitment for the Sprint Backlog.False Incorrect. The Sprint Goal is created in every Sprint Planning by the whole Scrum Team.
Learn it on Day 6: Sprint 1 Planning
Check answer
Question 12 of 41 Choose 1
Ansel (Developer) Daily Scrum update for you, Ada: yesterday the import screen, today the same, no blockers.
The Developers report to you every morning. What do you do? Ask follow-up questions, so you understand everyone's progress in detail Incorrect. That makes it a status report to you.Step out of the centre and coach them to plan the day together Correct. Right. The Daily Scrum is the Developers' event.Make them answer the three fixed questions, in strict order Incorrect. The Developers can choose any structure that focuses on the Sprint Goal.
Learn it on Day 7: The first impediment
Check answer
Question 13 of 41 Choose 1
Augustin (Engineering Manager) I'll keep attending the Daily Scrum. I need to know who's slacking.
What do you do? Let him lead it: he's been their manager for years and knows the work Incorrect. The Daily Scrum belongs to the Developers.Explain it's the Developers' event; offer him the Sprint Review Correct. Right. A manager watching for “slackers” turns the event into a report and kills openness.Tell him he's not allowed anywhere near the team's events Incorrect. The aim is to coach him, not shut him out.
Learn it on Day 7: The first impediment
Check answer
Question 14 of 41 Choose 2
Alba (Developer) The bank still hasn't given us test access for the integration. Two days now.
Which two are part of how you serve the team here? Getting the blocker removed, with the people who can grant access Correct. Correct. Removing impediments to the team's progress is part of the Scrum Master accountability.Telling Alba (Developer) to simply wait until access arrives Incorrect. Waiting wastes the Sprint.Helping the team see what they can still do toward the goal Correct. Correct. You also coach the team to adapt their plan.Writing the integration code yourself, to unblock them Incorrect. You aren't there to do the Developers' work for them.
Learn it on Day 7: The first impediment
Check answer
Question 15 of 41 Choose 1
Aurelia (Head of Product) Quick one for the team: add a VAT report this week. It's tiny.
What do you suggest? Point her to Abbas, who can add it to the backlog and weigh it Correct. Right. New work goes through the Product Owner.Ask Ari (Developer) to squeeze it in, as it sounds small Incorrect. That bypasses the Product Owner and risks the Sprint Goal.Tell Aurelia that no new requests are allowed during a Sprint at all Incorrect. Scope can be clarified and renegotiated with the Product Owner, as long as the Sprint Goal isn't endangered.
Learn it on Day 8: Protect the Sprint
Check answer
Question 16 of 41 Choose 1
Abbas (Product Owner) If the bank changed its API so our Sprint Goal made no sense, who could cancel the Sprint?
Which statement is true? The Scrum Master cancels Sprints when goals change Incorrect. The Scrum Master doesn't have that authority.Aurelia (Head of Product) can cancel it as sponsor Incorrect. Stakeholders can inform the decision, but only the Product Owner cancels.Only the Product Owner, and only if the goal is obsolete Correct. Correct.
Learn it on Day 8: Protect the Sprint
Check answer
Question 17 of 41 Choose 1
Ari (Developer) Ansel (Developer) skipped the code review to finish faster. I'm not sure I should say anything.
What do you do? Tell Ari (Developer) to stay out of other people's work Incorrect. That discourages openness and quality.Report Ansel (Developer) to Augustin, his former line manager Incorrect. Escalating to the line manager undermines the team's self-management.Back Ari: the team holds each other to the Definition of Done Correct. Right. Developers hold each other accountable as professionals.
Learn it on Day 9: Let the team solve it
Check answer
Tallybook
Sprint 2 Goal: customers can send their first invoice
Question 18 of 41 True or false
Augustin (Engineering Manager) The Sprint Review is just a demo for me, right? I'll sign off what's acceptable.
True or false: the Sprint Review is a sign-off gate for managers. True Incorrect. The Sprint Review is a working session to inspect the outcome and adapt the Product Backlog, not an approval gate.False Correct. Correct. Stakeholders and the team look at what was done and decide together what to do next.
Learn it on Day 10: Review and Retrospective
Check answer
Question 19 of 41 Choose 1
Ari (Developer) The invoice feature has no tests yet. Ansel (Developer) wants to show it as done.
What should happen? Not Done, so not in the Increment; it returns to the backlog Correct. Right. Only Done work is part of the Increment.Show it as done: it works, and nobody will notice the tests Incorrect. That breaks transparency.Show it now and mention the missing tests later on Incorrect. Stakeholders would plan on something that isn't usable.
Learn it on Day 10: Review and Retrospective
Check answer
Question 20 of 41 Choose 1
Ada (Scrum Master) In the first Retrospective, nobody speaks. Augustin (Engineering Manager) is sitting in the corner.
What do you do? Tell the team what went wrong yourself, to save everyone's time Incorrect. Then the improvements are yours, not theirs.Use a simple format, make it safe, and talk with Augustin Correct. Right. A manager in the room can make people silent. The Retrospective is the Scrum Team's event.End it early, as they clearly don't need a Retrospective yet Incorrect. Silence usually means it doesn't feel safe yet.
Learn it on Day 10: Review and Retrospective
Check answer
Question 21 of 41 Choose 1
Alba (Developer) None of us has built invoicing with tax rules. Augustin (Engineering Manager) says just give it to an outside contractor.
What do you encourage? Help the team grow the skill inside, by pairing with an expert Correct. Right. You coach the team toward cross-functionality.Hand the feature to the contractor, and let the team wait for it Incorrect. The skill stays outside, and the team stays dependent.Tell Alba (Developer) to learn it alone at the weekend Incorrect. That puts the gap on one person's free time.
Learn it on Day 11: A skill the team lacks
Check answer
Question 22 of 41 Choose 1
Aurelia (Head of Product) Ansel, while you're on invoices, add a logo upload too. Shouldn't take long.
Ansel (Developer) looks at you. What do you do? Let Ansel say yes: she's senior, and it's quicker than arguing Incorrect. The Product Owner's ordering is ignored and the Sprint Goal is at risk.Tell her she can't talk to the team about work at all Incorrect. Stakeholders can talk to the team. The question is who decides the work.Thank her and suggest bringing it to Abbas, who orders it Correct. Right. You redirect without embarrassing anyone.
Learn it on Day 12: The CEO at the desk
Check answer
Question 23 of 41 Choose 2
Aurelia (Head of Product) Why can't I decide what's built? I'm Head of Product.
Which two statements help her understand? Changes to the backlog come by convincing the Product Owner Correct. Correct, from the Scrum Guide.The Scrum Master decides between rival stakeholders Incorrect. No. The Scrum Master facilitates; the Product Owner decides.The organisation must respect the Product Owner's decisions Correct. Correct. That's what makes the role work.Senior stakeholders can order the backlog directly Incorrect. Ordering is the Product Owner's accountability.
Learn it on Day 12: The CEO at the desk
Check answer
Question 24 of 41 Choose 1
Ansel (Developer) Our Daily Scrum went 40 minutes again. We got into invoice code details.
What do you suggest? Make it an hour: the invoicing details really matter Incorrect. Longer isn't better. Details belong in follow-up conversations.Keep it to 15 minutes; those needing details meet after Correct. Right. The Daily Scrum is 15 minutes.Skip it until the invoicing work is finished and tested Incorrect. That removes a daily chance to inspect and adapt.
Learn it on Day 13: Waiting for answers
Check answer
Question 25 of 41 Choose 1
Ari (Developer) The stories have no acceptance criteria. I don't know what to test.
How do you help? Write the acceptance criteria yourself, to save Abbas some time Incorrect. Clear backlog items are the Product Owner's accountability, with the Developers.Show Abbas and the team a simple way to write criteria together Correct. Right. The Scrum Master helps the team understand the need for clear and concise Product Backlog items.Tell Ari to test whatever she thinks is sensible for now Incorrect. Then nobody agrees what success looks like.
Learn it on Day 13: Waiting for answers
Check answer
Question 26 of 41 Choose 1
Ansel (Developer) We spend the first two hours of every Sprint Planning arguing about what the items even mean.
What do you help the team set up? Abbas and the Developers clarify upcoming items each week Correct. Right. Regular refinement during the Sprint spreads the thinking out, so items arrive at Sprint Planning ready and planning can focus on the goal.Make Sprint Planning longer, so there's time to fit the debates Incorrect. A longer meeting treats the symptom, not the cause.Ask Abbas to write every item in full detail, on his own Incorrect. Items become clear faster when the Developers help refine them.
Learn it on Day 4: Transparency first
Check answer
Tallybook
Sprint 3 Goal: customers see a simple profit and loss summary
Question 27 of 41 Choose 1
Aurelia (Head of Product) The investors want an exact launch date for the mobile app. Ada, just give me one.
What do you do? Help Abbas forecast a likely range from what's been finished Correct. Right. Forecasts come from evidence, and they're updated as you learn.Give her a firm date, to keep her and the investors calm Incorrect. A promise nobody can back up becomes a broken promise.Refuse to talk about dates, as Scrum has no deadlines Incorrect. Stakeholders need to plan. Evidence helps them do it.
Learn it on Day 14: Dates and promises
Check answer
Question 28 of 41 True or false
Abbas (Product Owner) Can burn-up charts tell me exactly when we'll finish?
True or false: forecasting tools like burn-ups replace the need for empiricism. True Incorrect. They can help, but only what has already happened can be used for forward-looking decisions.False Correct. Correct. Forecasting practices are useful, but they don't replace empiricism.
Learn it on Day 14: Dates and promises
Check answer
Question 29 of 41 Choose 1
Aurelia (Head of Product) Let's report the team's velocity to the board. And let's ask them to raise it every Sprint.
What do you advise? Agree: higher velocity means more value for customers Incorrect. Velocity measures work, not value. Pushing it just inflates estimates.Hide all the team's numbers from the board, to protect it Incorrect. Transparency is good. The point is to show the right numbers.Suggest outcome measures, and keep velocity for team planning Correct. Right. Help the organisation measure outcomes, not output (Common practice).
Learn it on Day 16: Learning from real users
Check answer
Question 30 of 41 Choose 1
Alba (Developer) We need a paid bank-data service. IT says finance must approve; finance says it's IT's job. It's been a week.
What do you do? Wait: IT and finance will work it out between them Incorrect. The barrier stands and the Sprint Goal is at risk.Pay for the licence yourself and claim it back later Incorrect. A workaround that hides the problem and likely breaks the rules.Get IT, finance and Abbas in one short meeting today Correct. Right. Removing barriers between stakeholders and the team often means bringing the decision-makers together.
Learn it on Day 17: A blocker above the team
Check answer
Question 31 of 41 Choose 1
Amos (Support Lead) Abbas (Product Owner) said no to my dark-mode request in front of everyone. Back me up, Ada.
What role do you take? Stay neutral, and help Amos explain the value to Abbas Correct. Right. You make the conversation good; the Product Owner decides.Back Amos (Support Lead), to keep him happy and on side Incorrect. Taking sides undermines the Product Owner.Tell Amos product decisions are none of your business Incorrect. Facilitating stakeholder collaboration is part of serving the Product Owner.
Learn it on Day 18: Facilitating a clash
Check answer
Question 32 of 41 Choose 1
Ansel (Developer) We took shortcuts to hit the invoice Sprint. Now every change takes twice as long. Should we fix it quietly?
What do you advise? Fix it quietly over the next Sprints; Abbas doesn't need the detail Incorrect. Hidden work breaks transparency.Make the debt and its cost visible to Abbas in the backlog Correct. Right. Technical debt is Common practice language; transparency is a Scrum pillar.Ignore it until after launch, when there's more time for it Incorrect. Technical debt grows and slows the team more each Sprint.
Learn it on Day 19: Making debt visible
Check answer
Question 33 of 41 Choose 2
Ari (Developer) Maybe we should add “no new known shortcuts” to our Definition of Done.
Which two statements are true? The team can strengthen its Definition of Done over time Correct. Correct. As teams mature, their Definition of Done is expected to include more stringent criteria.Once agreed, the Definition of Done can never change Incorrect. It can and should evolve.The Retrospective is a good place to decide changes to it Correct. Correct. The Retrospective inspects the Definition of Done among other things.The Scrum Master should change it alone when needed Incorrect. It belongs to the Scrum Team.
Learn it on Day 19: Making debt visible
Check answer
Question 34 of 41 Choose 1
Alba (Developer) Every time I merge, Ansel (Developer) rewrites my code without asking.
The Retrospective gets tense. What do you do? Keep it about the code, and help them agree how merges work Correct. Right. Handling conflict openly and respectfully (Common practice).Decide who is right yourself, and close the topic for good Incorrect. Judging makes you a referee; the other person stops speaking up.Tell them to sort it out between themselves after the meeting Incorrect. Avoiding it lets it grow.
Learn it on Day 20: Conflict in the Retro
Check answer
Tallybook
Sprint 4 and beyond Goal: customers get paid faster with payment links
Question 35 of 41 True or false
Abbas (Product Owner) Should I even be in the Retrospective? It's the team's meeting.
True or false: the Product Owner takes part in the Sprint Retrospective. True Correct. Correct. The Sprint Retrospective is for the whole Scrum Team.False Incorrect. The Product Owner is part of the Scrum Team and improves with it.
Learn it on Day 20: Conflict in the Retro
Check answer
Question 36 of 41 Choose 1
Ari (Developer) We're doing the same Retrospective every time. People are bored.
What do you try? Skip it this Sprint, as the team seems bored of it Incorrect. Every Sprint has a Retrospective.Run it yourself, and tell them what the main issues are Incorrect. It's the team's improvement, not yours.A new format such as 4Ls, after checking last Sprint's action Correct. Right. Fresh formats and following up on actions keep Retrospectives useful.
Learn it on Day 15: Is it really done? Technique: 4Ls: Liked, Learned, Lacked, Longed for
Check answer
Question 37 of 41 Choose 1
Aurelia (Head of Product) Scrum works! Let's switch every department to it on Monday. Send them your templates.
What do you advise? Send the Scrum templates, and let every department start Monday Incorrect. Copying practices without understanding gives the forms without the results.Start with one or two keen teams and teach them the why Correct. Right. Planning and advising Scrum implementations is how the Scrum Master serves the organisation.Say Scrum only works for software teams, not others Incorrect. Scrum is used for many kinds of complex work.
Learn it on Day 23: Scrum beyond the team
Check answer
Question 38 of 41 Choose 1
Augustin (Engineering Manager) Fine. Then I'll be the Scrum Master for the next team. I'm their manager anyway.
What do you explain? Managers always make the best Scrum Masters for their own team Incorrect. Managing people and serving a self-managing team pull in different directions.Being manager and Scrum Master makes self-managing hard Correct. Right. There is no hierarchy in a Scrum Team. Coaching can easily turn into directing.Only people with a Scrum certificate may take the role Incorrect. The Guide doesn't require any certificate.
Learn it on Day 23: Scrum beyond the team
Check answer
Question 39 of 41 Choose 1
Ari (Developer) Payment links work, but there's a bug with one bank. Launch is tomorrow.
What happens to that part? It isn't Done, so it waits; Abbas decides what launches Correct. Right. Only Done work is released.Release it anyway, as the launch posters are printed Incorrect. Releasing undone work breaks the promise of the Definition of Done.Delay the whole launch until everything is perfect Incorrect. The rest of the Increment is Done and valuable.
Learn it on Day 24: Hold the line on Done
Check answer
Question 40 of 41 Choose 1
Augustin (Engineering Manager) Fine, the team can decide some things. But which?
Which technique makes this clear? The team decides everything from now on, on its own Incorrect. Unclear and unrealistic; it will be taken back at the first problem.Augustin decides everything, just as he did before Incorrect. That blocks self-management.Delegation levels: agree who decides each recurring decision Correct. Right. Tools and working hours: team decides. Hiring: together. Budget: Augustin after asking.
Learn it on Day 25: A team that runs itself Technique: Delegation levels
Check answer
Question 41 of 41 Choose 1
Ansel (Developer) Customers keep finding the same kind of bank-import bug. We fix one, another appears.
How do you help the team find the cause? Tell Ansel to be much more careful with every release Incorrect. Blame doesn't fix the process.Add more testers to the team to catch every mistake Incorrect. You'd treat the symptom.Ask “why?” several times until you reach the process cause Correct. Right. Why bugs? No test data for odd bank formats. Why? Nobody collects them. Fix: a shared set of real formats.
Learn it on Day 17: A blocker above the team Technique: 5 Whys
Check answer