Shift-planning startup 43 questions 5 phases
Rotaly: a Scrum Master case study Rotaly helps cafés and shops plan staff shifts. The startup has twelve months of money left, a founder who works every weekend and expects the same, and two senior developers who stopped talking to each other after a failed release. You've joined as Scrum Master to help the team find a pace and a way of working that lasts.
What this case study tests
Conflict in the team Sustainable pace Founder pressure Technical debt
You're the Scrum Master. For each situation, choose your answer and press Check . Every option is then explained, right or wrong.
Team
Archer (Product Owner) Co-founder, ex-salesperson Adela (Developer) Backend, the original coder Ahmet (Developer) Frontend, joined last year Alicja (Developer) Testing and support fixes Stakeholders
Augusta (Founder and CEO) Investor pressure Arnav (Investor) Wants growth numbers Amara (Customer Success Lead) Talks to every café Abe (Café owner) Plans 14 staff every week Rotaly
Getting started A small team under pressure
Question 1 of 43 Choose 1
Augusta (Founder and CEO) We don't have time for Scrum ceremonies. We need to ship. Can't we skip the meetings?
What do you explain to Augusta (Founder and CEO)? Meetings are optional in Scrum, so skip the ones that drag on too long Incorrect. The events are part of Scrum. Scrum is immutable.Scrum's events replace other meetings and are where the team adapts Correct. Right. Each event has a purpose, and they're timeboxed to keep them short.We'll do the Scrum events only when there's time to spare Incorrect. Then it isn't Scrum, and the team loses its feedback loops.
Learn it on Day 1: A new team
Check answer
Question 2 of 43 Choose 1
Adela (Developer) Ahmet broke production last month and blamed my code. I'm not working with him.
What is a good first step? Talk with each one-on-one about what happened and what they need Correct. Right. One-on-ones help you understand the people before working on the team (Common practice).Tell them to get over it and focus on the next release Incorrect. Ignoring conflict lets it grow.Look at the release logs and decide which of them was in the right Incorrect. Judging makes you a referee, not a coach.
Learn it on Day 1: A new team
Check answer
Question 3 of 43 True or false
Archer (Product Owner) I'm the Product Owner and co-founder. Can I just tell the developers what to code each day?
True or false: the Developers decide how to turn Product Backlog items into a Done Increment. True Correct. Correct. The Product Owner decides what and why; the Developers decide how.False Incorrect. The Developers are self-managing in how they do the work.
Learn it on Day 4: Transparency first
Check answer
Question 4 of 43 Choose 1
Amara (Customer Success Lead) Every café asks for something different. I just forward everything to the developers.
What do you suggest? Keep forwarding everything: the developers can sort out the requests Incorrect. Work from many sides means nobody knows what matters most.Stop taking café requests until the next release is out Incorrect. Customer input is valuable; it just goes to the right place.Send requests to Archer, who orders them in the Product Backlog Correct. Right. One Product Backlog, ordered by one Product Owner.
Learn it on Day 2: Who talks to whom
Check answer
Question 5 of 43 Choose 1
Arnav (Investor) I want weekly reports on each developer's output.
What can you offer Arnav (Investor) instead? Individual output reports for each developer, every week Incorrect. That invites micromanagement and fear.Nothing: investors don't need to see the team's details Incorrect. They're important stakeholders with real needs.A seat at the Sprint Review, and outcomes like active cafés Correct. Right. Transparency about value, not individual output.
Learn it on Day 1: A new team
Check answer
Question 6 of 43 Choose 1
Alicja (Developer) What does “Done” mean here? Adela calls things done when they compile.
What do you help the team create? A shared Definition of Done that every item must meet Correct. Right. It creates transparency about what is truly finished.A personal quality checklist for each developer to follow Incorrect. Quality must be shared.Nothing formal: everyone knows what “done” means Incorrect. Clearly it isn't, if people disagree.
Learn it on Day 5: Team agreements
Check answer
Question 7 of 43 Choose 1
Augusta (Founder and CEO) One-week Sprints, two weeks, a month? Just pick one for them.
Which statement is true? The CEO sets the Sprint length to match the funding cycle Incorrect. It serves the team's learning, not a manager's preference.Sprints are one month or less, usually agreed by the team Correct. Correct. The Guide sets the maximum; who picks it is common practice.Sprint length can change every Sprint to fit the work Incorrect. Sprints are fixed-length for consistency.
Learn it on Day 5: Team agreements
Check answer
Question 8 of 43 Choose 1
Archer (Product Owner) Can you write the Product Goal? I'm terrible with words.
How do you help? Facilitate a short session so Archer can shape and own it Correct. Right. You help find techniques for effective Product Goal definition.Write the goal for him, since he's busy with café customers Incorrect. The Product Goal is the Product Owner's accountability.Skip it: startups move too fast for long-term goals Incorrect. Fast change is exactly when a clear goal helps.
Learn it on Day 3: Coach the vision
Check answer
Rotaly
Sprint 1 Goal: café owners can copy last week's rota in one click
Question 9 of 43 Choose 1
Augusta (Founder and CEO) Put copy, drag-and-drop and payroll export in this Sprint. Investors visit Friday.
Who selects how much work goes into the Sprint? Augusta (Founder and CEO), who funds the work and the team Incorrect. Stakeholders share needs; they don't set the workload.Arnav (Investor), who watches how the money is spent Incorrect. Investors aren't in Sprint Planning.The Developers, after talking value with the Product Owner Correct. Right. A forecast the Developers believe in is the one they can keep.
Learn it on Day 6: Sprint 1 Planning
Check answer
Question 10 of 43 Choose 1
Adela (Developer) I'll do the backend, Ahmet does the front, and we don't need to talk.
What do you coach? Fine: split the Sprint cleanly between them, so they don't clash Incorrect. Without collaboration, the pieces may not fit, and the Sprint Goal suffers.The Developers share one Sprint Goal and plan it together Correct. Right. They're one team accountable for one Increment.Assign the two of them to work in alternate Sprints, apart Incorrect. That avoids the problem instead of solving it.
Learn it on Day 9: Let the team solve it
Check answer
Question 11 of 43 Choose 2
Ahmet (Developer) Daily Scrum is a waste. Adela doesn't listen anyway.
Which two actions help? Keep the Daily Scrum short and focused on the goal Correct. Correct. 15 minutes, about the next day's plan.Cancel it for now, until the two of them get along Incorrect. That removes the daily chance to coordinate.Continue one-on-ones on the conflict, outside the event Correct. Correct. Handle the conflict where there's room for it.Run it yourself and assign the tasks to keep order Incorrect. That takes away self-management.
Learn it on Day 7: The first impediment
Check answer
Question 12 of 43 Choose 1
Alicja (Developer) Our test phones broke and Augusta says there's no budget.
What do you do? Tell the team to test on emulators only and call it done Incorrect. That may break the Definition of Done.Show Augusta what the missing phones cost, and agree a fix Correct. Right. Removing impediments sometimes means making the cost visible.Buy the test phones with your own money and claim it later Incorrect. A workaround that hides the problem.
Learn it on Day 7: The first impediment
Check answer
Question 13 of 43 Choose 1
Amara (Customer Success Lead) A big café chain wants a new report this week, or they won't sign.
What do you suggest? Take it to Archer, who can weigh it against the Sprint Goal Correct. Right. Scope can be renegotiated with the Product Owner without endangering the Sprint Goal.Ask Alicja (Developer) to quietly sneak the report into the Sprint Incorrect. That bypasses the Product Owner.Tell Amara the Sprint is locked and nothing can change Incorrect. Scope can be clarified and renegotiated during the Sprint.
Learn it on Day 8: Protect the Sprint
Check answer
Question 14 of 43 True or false
Augusta (Founder and CEO) If the chain changes their mind, I'll cancel the Sprint.
True or false: only the Product Owner can cancel a Sprint. True Correct. Correct, and only if the Sprint Goal becomes obsolete.False Incorrect. Only the Product Owner has that authority.
Learn it on Day 8: Protect the Sprint
Check answer
Question 15 of 43 Choose 1
Ahmet (Developer) Adela skipped the code review again. Should I just let it go?
What do you say? Yes: skipping it once avoids another fight between them Incorrect. Quality and openness matter more than avoiding discomfort.Report her to Augusta (Founder and CEO) for skipping the review Incorrect. Escalating to the CEO undermines self-management.No: code review is in the Definition of Done they agreed Correct. Right. Developers hold each other accountable as professionals.
Learn it on Day 9: Let the team solve it
Check answer
Question 16 of 43 Choose 1
Arnav (Investor) At the Review I'll just look at the slides and leave.
How do you set up the Sprint Review? As a polished slide deck for the investors to see Incorrect. Then nobody inspects the real product.As a formal sign-off meeting with the founder, Augusta Incorrect. The Review isn't a gate.As a working session where stakeholders use the app Correct. Right. Not a presentation.
Learn it on Day 10: Review and Retrospective
Check answer
Question 17 of 43 Choose 1
Adela (Developer) Augusta (Founder and CEO) added four urgent items to our Sprint Backlog on Saturday night without telling anyone.
What do you do? Do the four items this Sprint: she's the founder, after all Incorrect. Then the Sprint Goal stops meaning anything.Talk with Augusta and Archer: new requests go through Archer Correct. Right. The Sprint Backlog belongs to the Developers; new work goes to the Product Backlog through Archer, and urgent changes are agreed with the Developers.Delete them quietly from the board on Monday, before anyone starts Incorrect. Silent fights don't solve the problem; talk to her.
Learn it on Day 6: Sprint 1 Planning
Check answer
Rotaly
Sprint 2 Goal: staff can swap shifts on their phones
Question 18 of 43 Choose 1
Aliya (Scrum Master) The Retrospective goes silent whenever Adela and Ahmet are both in the room.
What helps most? A structure where everyone contributes, with a no-blame rule Correct. Right. Make it safe; the team chooses its improvements.Skip the Retrospective until things have calmed down between them Incorrect. Every Sprint ends with a Retrospective.Tell the team clearly what's going wrong and why it matters Incorrect. Then the improvements are yours, not theirs.
Learn it on Day 10: Review and Retrospective
Check answer
Question 19 of 43 Choose 1
Alicja (Developer) None of us has built push notifications before.
What do you encourage? Hire a contractor and keep the team away from it Incorrect. The skill never enters the team.Help them learn together, by pairing with an expert Correct. Right. Coach the team toward cross-functionality.Drop notifications from this release entirely Incorrect. That's a product decision for Archer (Product Owner).
Learn it on Day 11: A skill the team lacks
Check answer
Question 20 of 43 Choose 1
Augusta (Founder and CEO) (at Ahmet's desk) Make the swap screen purple, investors like purple.
What do you do? Thank her and suggest bringing it to Archer first Correct. Right. Redirect every request to the Product Owner, politely.Let Ahmet (Developer) do it, to keep the peace Incorrect. That bypasses the Product Owner.Tell her to stay out of the team's office Incorrect. Collaboration is fine; deciding work is the issue.
Learn it on Day 12: The CEO at the desk
Check answer
Question 21 of 43 Choose 2
Augusta (Founder and CEO) I'm the founder. Why can't I decide what's built?
Which two statements help her understand? The Product Owner's decisions show in the backlog order Correct. Correct.To change the order, people convince the Product Owner Correct. Correct, from the Scrum Guide.Founders can order the Product Backlog directly Incorrect. The Product Owner orders it.The Scrum Master decides between founder and Product Owner Incorrect. You facilitate; the Product Owner decides.
Learn it on Day 12: The CEO at the desk
Check answer
Question 22 of 43 Choose 1
Ahmet (Developer) We wait days for Archer to answer. He's always on sales calls.
What do you do? Answer the product questions yourself, to speed things up Incorrect. Product decisions are the Product Owner's.Let the developers guess, and fix it later if they turn out wrong Incorrect. Guessing leads to rework.Help Archer and the team agree a faster way to get answers Correct. Right. Short feedback loops keep work moving.
Learn it on Day 13: Waiting for answers
Check answer
Question 23 of 43 Choose 1
Augusta (Founder and CEO) Give me the exact date payroll export will be ready. Arnav needs it.
How do you help Archer (Product Owner) answer? Promise it for next month, to keep the cafés and Arnav happy Incorrect. A promise without evidence becomes a broken promise.Help him forecast a range from what the team has finished Correct. Right. Forecasting stays empirical.Refuse to give any dates, since startup plans change Incorrect. Stakeholders need to plan.
Learn it on Day 14: Dates and promises
Check answer
Question 24 of 43 True or false
Arnav (Investor) Burn-up charts mean you can promise exact dates, right?
True or false: forecasting tools replace the need for empiricism. True Incorrect. Only what has already happened can be used for forward-looking decisions.False Correct. Correct. Burn-ups help, but they don't replace empiricism.
Learn it on Day 14: Dates and promises
Check answer
Question 25 of 43 Choose 1
Alicja (Developer) Shift swap is done. Can we release it Tuesday, not wait for the Review?
What is right? Releases only happen after the Sprint Review has approved them Incorrect. The Review isn't a release gate.A Done Increment can be released before the Sprint ends Correct. Right. Release value when it's ready.Wait until all the planned features are done, then release Incorrect. That delays value and feedback.
Learn it on Day 15: Is it really done?
Check answer
Question 26 of 43 Choose 1
Ahmet (Developer) Alicja and I disagree about every item, so we've both stopped going to refinement.
How do you help? Let the Product Owner refine the items alone from now on Incorrect. Then the people building it lose their say.Have them refine separately, and then pick one version Incorrect. That makes one of them the loser every time.Facilitate so both are heard, starting from the café's need Correct. Right. Refinement is where disagreements should surface, early and safely; small experiments or clear acceptance criteria settle technical differences.
Learn it on Day 4: Transparency first
Check answer
Rotaly
Sprint 3 Goal: payroll gets the hours automatically
Question 27 of 43 Choose 1
Arnav (Investor) Let's track velocity and fire whoever is slowest.
What do you advise? Measure outcomes for customers, like active cafés Correct. Right. Velocity isn't value or individual performance (Common practice).Agree: a velocity bonus motivates people to work faster Incorrect. It destroys trust and encourages gaming the numbers.Track the hours each person works instead of velocity Incorrect. Hours say nothing about value.
Learn it on Day 16: Learning from real users
Check answer
Question 28 of 43 Choose 1
Adela (Developer) The payroll provider won't give us API access without a contract. Augusta hasn't signed for two weeks.
What do you do? Scrape the payroll website instead, without asking anyone Incorrect. Risky, possibly illegal, and it hides the real problem.Wait until the payroll company replies to the request itself Incorrect. The barrier stays.Make the impact clear to Augusta and Archer, and get a decision Correct. Right. Remove the barrier by getting the decision-makers moving.
Learn it on Day 17: A blocker above the team
Check answer
Question 29 of 43 Choose 1
Amara (Customer Success Lead) Archer said no to my offline-mode request. Aliya, you agree with me, right?
What do you do? Agree with Amara (Customer Success), to keep her happy Incorrect. Taking sides undermines the Product Owner.Tell her product decisions aren't her concern at all Incorrect. Customer input is valuable.Stay neutral and help her explain the value to Archer Correct. Right. You facilitate; the Product Owner decides.
Learn it on Day 18: Facilitating a clash
Check answer
Question 30 of 43 Choose 1
Ahmet (Developer) We copy-pasted a lot to hit the investor demo. Now everything's slow to change.
What do you advise? Make the debt and its cost visible to Archer (Product Owner) Correct. Right. Weigh it openly in the Product Backlog.Hide it until after the next funding round is closed, then fix it Incorrect. Hidden debt slows the team and breaks transparency.Blame Adela (Developer) for taking the shortcuts in the first place Incorrect. Blame doesn't fix it.
Learn it on Day 19: Making debt visible
Check answer
Question 31 of 43 Choose 1
Adela (Developer) Fine, we cut corners. But only because Augusta pushed us.
How do you respond? Agree it's Augusta's fault for pushing the team too hard Incorrect. Blame doesn't change anything.Look at how it happened, without blame, and learn from it Correct. Right. They agreed to say “not done” rather than cut quality.Say it's the developers' own fault for cutting the corners Incorrect. Equally unhelpful.
Learn it on Day 19: Making debt visible
Check answer
Question 32 of 43 Choose 2
Alicja (Developer) Can we add “load tested with 50 staff” to our Definition of Done?
Which two statements are true? The team can strengthen its Definition of Done as it learns Correct. Correct.The Retrospective is a good moment to agree the change Correct. Correct.Only the CEO can change the Definition of Done here Incorrect. It belongs to the Scrum Team.The Definition of Done is set once and never changes Incorrect. It should evolve.
Learn it on Day 19: Making debt visible
Check answer
Question 33 of 43 Choose 1
Adela (Developer) (in the Retrospective) Ahmet, you never test your screens before merging!
Ahmet starts shouting back. What do you do? Pause, slow it down, and agree one working rule Correct. Right. They agreed to review each other's code before merging.Let them shout it out: it clears the air for good Incorrect. That damages trust further.End the Retrospective early and move on quietly Incorrect. The conflict needs a safe place, not to be buried.
Learn it on Day 20: Conflict in the Retro
Check answer
Question 34 of 43 Choose 1
Ahmet (Developer) That was hard. Will we be OK?
What do you do afterwards? Nothing more: the argument is over now, so move on Incorrect. Trust needs follow-up.Ban disagreements in future team meetings, to be safe Incorrect. Healthy disagreement helps teams improve.One-on-ones with both, and check the rule next time Correct. Right. Follow-up builds trust.
Learn it on Day 20: Conflict in the Retro
Check answer
Question 35 of 43 Choose 1
Alicja (Developer) Augusta (Founder and CEO) expects everyone to work weekends like her. People are exhausted, and two have mentioned leaving.
How do you help the team find a pace that lasts? Make the cost visible to Augusta and agree a sustainable pace Correct. Right. Respect for people includes their time, and real commitment to the goal means a pace the team can keep up for months. Exhausted teams make mistakes and leave.Accept it: every startup needs hard work at first, it'll pass Incorrect. Burnout costs more than the extra hours gain.Tell the team to quietly ignore what she expects of them Incorrect. Undermining the founder doesn't build a lasting solution.
Learn it on Day 12: The CEO at the desk
Check answer
Rotaly
Sprint 4 and beyond Goal: café owners get paid staff on time, every time
Question 36 of 43 Choose 1
Augusta (Founder and CEO) Everyone works this weekend. Funding depends on it.
What do you and Archer (Product Owner) say? Yes, just this once, to get the release out Incorrect. “Just this once” becomes a habit.Keep a sustainable pace and adjust scope Correct. Right. Tired teams make costly mistakes.No: the team never works weekends, ever Incorrect. Offer the scope lever.
Learn it on Day 22: Sustainable pace
Check answer
Question 37 of 43 Choose 1
Adela (Developer) (one-on-one) I've been coding every night for a month. I'm exhausted.
What do you do? Praise her dedication in front of the whole team, as an example Incorrect. Praising hidden overtime encourages more of it.Help her make the load visible so the team can share it Correct. Right. Hidden overtime is an impediment.Tell Augusta (Founder and CEO) to give her a bonus for it Incorrect. Money doesn't fix the pace.
Learn it on Day 22: Sustainable pace
Check answer
Question 38 of 43 Choose 1
Ahmet (Developer) Everyone says we're fine, but nobody looks fine.
How can the team see the trend? A short health check of the team every few Sprints Correct. Right. “Pace” turning poor gives the team evidence to push back on weekend work.Ask Augusta (Founder and CEO) how the team is doing Incorrect. The team knows best.Wait until someone quits, then look at why Incorrect. By then it's too late.
Learn it on Day 22: Sustainable pace Technique: Team health check
Check answer
Question 39 of 43 Choose 1
Archer (Product Owner) Sales wants their own Scrum team. Can Augusta be their Scrum Master?
What do you explain? Yes: CEOs make great Scrum Masters for their teams Incorrect. Managing and serving pull in different directions.Only people with a certificate are allowed to be Scrum Masters Incorrect. The Guide doesn't require a certificate.Being CEO and Scrum Master at once makes self-managing hard Correct. Right. There's no hierarchy in a Scrum Team.
Learn it on Day 23: Scrum beyond the team
Check answer
Question 40 of 43 Choose 1
Alicja (Developer) Automatic payroll works, but not for staff with two contracts. Launch is Monday.
What happens to that part? Release it: few staff have two contracts anyway Incorrect. Undone work isn't released.Delay the whole release until that part is ready too Incorrect. The rest is Done and valuable.It waits, as it isn't Done; Archer decides what launches Correct. Right. Only Done work is part of the Increment.
Learn it on Day 24: Hold the line on Done
Check answer
Question 41 of 43 Choose 1
Arnav (Investor) With the new funding, put ten more developers in the team.
What do you advise? Several Scrum Teams sharing one Product Owner and backlog Correct. Right. Scrum Teams are typically 10 or fewer.One big team of 14 people, so nobody gets split up from colleagues Incorrect. Large teams communicate worse.Each developer works alone on their own feature, to go faster Incorrect. That's not a team.
Learn it on Day 25: A team that runs itself
Check answer
Question 42 of 43 Choose 1
Adela (Developer) After that last fight, Ahmet and I aren't really talking. Are we broken?
What do you help them understand? Yes: split them into different teams for good, to stop it Incorrect. That avoids the growth.Teams storm before they norm; open conflict is part of it Correct. Right. Your help now: facilitate the storm, then step back as they agree new norms.Conflict means Scrum isn't working for this team at all Incorrect. Conflict is normal; how it's handled matters.
Learn it on Day 25: A team that runs itself Technique: Team stages (forming to performing)
Check answer
Question 43 of 43 Choose 1
Alicja (Developer) Augusta pushes, Adela takes shortcuts, bugs follow. How do we talk about it without blame?
Which approach fits? A blameless review that changes the process, not people Correct. Right. They agree to say “not done” rather than cut quality, and you back them.Find who caused the bugs and talk to them about it Incorrect. Blame hides the process problem.Fix the bugs quickly and move on to the next new work Incorrect. It will happen again.
Learn it on Day 19: Making debt visible Technique: Blameless review