← Capability study report: explanationFilled-in example Blank template
Day in the RoleCapability study reportHow well the process meets its requirement
Version1.0
Date15 March
ProcessRoutine appointment booking
RequirementUpper limit 7 days
Data and periodWaits, weeks 12 to 20 (stable period)
Sample size60 random requests

1. Stability first

Run chart of 20 weeks: a shift at week 12 (9 points above the median). Weeks 12 to 20 are stable and used.

2. Shape of the data

Statis­ticValue
Mean10.43 days
Median10 days
Standard deviation6.46 days
Range3 to 28 days
ShapeSkewed right
Normality testp about 0.0001: not normal

3. Capability

MeasureValueHow cal­culated
Observed over the limit55%33 of 60
Per million550,0000.55 × 1,000,000
Ppk (upper)−0.18(7 − 10.43) ÷ (3 × 6.46)
Sigma levelabout 1.4NORM.S.INV(0.45) + 1.5
Log scale (Box-Cox λ ≈ 0)63% predictedchecked against 55% observed

Report the observed share outside the limits first. Use Cp, Cpk, Pp and Ppk only when the data is roughly normal, or after a checked transformation.

4. What it means

The process can't meet the requirement: more than half of patients wait too long. Because the data is skewed, the observed share is the headline figure.

Project leader
Signature
Date
Sponsor
Signature
Date

Letters and symbols: Cp · Cpk · Pp · Ppk Capability indices: how well the process spread fits within the requirement limits (k: allowing for where the process is centred; C: short term, P: overall) · λ Lambda: the power a Box-Cox transformation raises the data to · ÷ × Divided by, multiplied by

Day in the Role · Capability study reportIllustrative example · not a real project or organisation · dayintherole.com