← FMEA worksheet: explanationFilled-in example Blank template
Day in the RoleFMEA worksheetHow the process could fail, ranked by risk
ProcessRoutine appointment booking
Team
Date
StepFailure modeEffectSCauseOCurrent controlDRPNAction
Phone requestCan't get through at 8 amTold to call back; wait grows7All slots released at 8 am8None3168Release slots ahead (Improve)
TriageUrgent case booked into a routine slotRoutine capacity lost6No clear rule6None7252Urgent slots, daily count
BookingWrong appointment typePatient rebooked4Unclear list3Checked at check-in560
RotaRota released lateFewer slots to offer7Rota done on Fridays4None6168Rota 4 weeks ahead
AppointmentPatient misses itSlot wasted6No reminder for phone bookings7Online reminders only4168Reminders for everyone
AppointmentSession cancelled latePatients rebooked8Sickness3Phone calls to patients248

S = severity, O = occurrence, D = detection, each 1 to 10 (D: 1 = always caught, 10 = never caught). RPN = risk priority number = S × O × D. Act on the highest RPNs, and on any S of 9 or 10.

Letters and symbols: S · O · D Severity, occurrence and detection scores in an FMEA · FMEA Failure modes and effects analysis · RPN Risk priority number: severity × occurrence × detection · ÷ × Divided by, multiplied by

Day in the Role · FMEA worksheetIllustrative example · not a real project or organisation · dayintherole.com